Recent News

Copyright © 2025 Indus OBServer. All Right Reserved.

Naqvi sets July 31 interchange deadline

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Share It:

Table of Content


.


ISLAMABAD:

Interior Minister Mohsin Naqvi on Tuesday visited the site of the Margalla Road–Motorway extension project, and directed that the Sangjani Interchange on GT Road be completed by July 31.

According to officials, the 2.7-kilometre-long project would feature a three-lane carriageway on both sides, along with a two-lane service road. The plan also included a GT Road interchange, two underpasses, and a bridge to ensure smooth and uninterrupted traffic flow.

The interior minister, during his visit, inspected ongoing construction activities and was given a detailed briefing on various components of the project.



Source link

Tags :

Serverindusob@gmail.com

https://eng.indusobserver.com

Leave a Reply

Your email address will not be published. Required fields are marked *

Grid News

Latest Post

Find Us on Youtube

Indus Observer is an independent digital news platform delivering the latest, authentic, and unbiased news from Pakistan and around the world. Our mission is to promote truth-based journalism by providing accurate information and timely analysis to our readers.

Latest News

Most Popular

Copyright © 2025 Indus OBServer themes. All Right Reserved.